Schaffner is the only manufacturer that can provide an on-site solution for your dry-type transformer rewind needs.
Building design, elevator capacity, or other factors can make removal of a failed transformers very difficult and impractical. Traditional solutions, such as major building reconstruction or elaborate rigging methods, are time consuming and cost prohibitive. Schaffner has a cost-effective answer.
Our engineers work closely with local electrical contractors or in-house maintenance staff to design a program that meets your needs. We can rebuild your original dry-type transformer on site and in place.
Our on-site program includes:
- Schaffner technicians who visit your site to assess the project requirements. Detailed measurements of the original unit are taken. We meet with your staff or contractor to make recommendations on the arrangement of rigging.
- After design and review by Schaffner engineers, we offer a proposal and project scope for the on-site rebuild. Under the direction of the contractor or maintenance staff, we provide disassembly of the transformer, removal of coils, installation of new factory-manufactured coils, and reassembly of the transformer.
Our on-site rebuild solution is much more cost effective than traditional solutions and is typically available within four to six weeks of order placement.
On-Site Transformer Rewind
Schaffner
Manufacturer: Schaffner Group